Relevant projects
• Nakheel New Offices, Port Rashid
• Nakheel New Offices, Jabel Ali
• DU New Offices, Academic City
• Burj Khalifah interior works Levels 18 to 25
• AL Jaber Optical, Aswaaq mall
• Wall street Exchange, Aswaaq nid al hamer &mezher
• Al Garhoud Bridge, Repair & Maintenance
• Mirdif Bridge, drain channel construction
• New Jersey Barrier at Al Nahda UP repair
• Trade Center, Interlock & Paving
• Al Shindagha Tunnel, Ceiling & Wall repair
• Sharjah Al Khan Bridge, Repair & Asphalt
• Qurtoba & Rotana Bridges Sharjah Municipality, Complete Maintenance
• Sharjah Airport, Bridges 1 & 2 complete maintenance
• Erection of self closing canal gates, Dubai
• Complete setup for the medical center of DHA at the Media City – Dubai
• The extension of Al Wasel Hospital for the DHA
• Construction of special heavy duty cold press machine foundation for Grandweld Shipyards at Al Jadaf – Dry Dock and Dubai Maritime City.
• Supply and Apply of Airtight Coating for Al Shindagha Tunnel Ceiling with ( Safety Closure)
Experience: Relevant projects
• Supply and Fabricating of Bearing Shelf covers of Sh. Zayed road bridges with ( Safety Closure)
• Repair the Abra steps at Deira side complete with offshore jobs.
• The Injection works at the Dubai Airport Tunnel with the main contractor CCC for water leaks.
• Repair and Maintain Sharjah Al Khan Bridge with Asphalt repair for Sharjah Municipality with ( Safety Closure)
Civil Maintenance Works carried out for Waagner Biro, Dubai
• Repair of damaged median parapet.
• Injection work AT Al Maktoum Bridge.
• Concrete Repair Garhoud Bridge Camel UP
• EJ bolt Sealants.
• Septic tank for Al Maktoum Bridge.
• Al Garhoud Bridge central parapet.
• Concrete repair Al Garhoud Bridge machinery pit floor
• Concrete Repair of Camel UP and Pedestrian Ups.
• Concrete Repair of Al Garhoud machinery pit Upstream.
• Concrete Repair of Al Garhoud machinery pit floor.
• Painting of Camel UP.
• Concrete repair Garhoud Bridge free abutment..
• Dhow Wharfage oil tank manholes.
• Painting of Garhoud fixed span pile caps.
• Repair of damaged wall at Al Qiyadah UP.
• Al Nahdah UP – Removal of block paving and sand
• New Jersey Barriers – shift to upper locations.
• Concrete Repair Al Nahdah UP piers.
• Al Safa Bridge – Cleaning drain channel.
• Al Garhoud Bridge central concrete parapet repair.
• Concrete Repair in Sheikh Zayed Road.
• Ant graffiti recoating at CMC & Safa Subways.
• Repair of damaged central parapet at Al Garhoud Bridge.
• Repair of damaged New Jersy barrier at Al Nahda UP.
• Erection of 9 Nos. self closing channel gates.
• Additional Interlock paving to Trade Center R/A area.
• Additional steel bollards at Abra landing steps.
• Expansion joints Repair at Al Nahdah UP, Al Qiyadah UP.
• Asphalt CMC UP, Clock Tower No. 2 UP. with ( Safety Closure)
• Complete injection works for the clock tower UP ( to stop the water leak)
• Concrete repair of Culvert at Sheikh Zaied Road
• Concrete Repair of Culvert at Al Ain Road.
• Coating the ceiling of Airport & Al Qiadah Under Pass with ( Safety Closure)
• Repair and seal of damaged joints and cracks at Ring Road Bridges with (Safety Closure)
• Repair and seal of damaged joints and cracks at Al Maktoum Bridge with (Safety Closure)
• Repair and seal of damaged joints and cracks at Rashid Hospital Bridge with ( Safety Closure)
• Repair and seal of damaged joints and cracks at Broadcast Bridge with (Safety Closure)
• Repair and seal of damaged joints and cracks at Trade Center UP No. 1 & 2 with ( Safety Closure)
Maintenance works at Al Shindagha Tunnel:
• Emergency road works at Shindagha Tunnel area.
• Expansion Joints repair.
• Damaged paint repair, Cracks sealing, Injection works, asphalt filling, crack filling, concreting etc.
• Injection work at Shindagha Tunnel Annual Maintenance.
• Painting of Pedestrian subway with ant graffiti Paint OF FOSROC DEKGUARD PU.
• Injection work, Concrete investigation at Shindagha Tunnel (Drill concrete core, half cell potential survey, test of concrete bond strength).